Tuesday, August 03, 2004


Three rounds in place. After all the preparation, these are exciting times. However, what a long way there is to go to the roof. These side walls will be 15 logs high and the end walls will have 14 logs. Two floors have to be placed as well. It will be a race against Mother Nature to get the roof on before the snow flies.

0 Comments: