First floor doors and windows appear. Window openings will be later cut to size and notched to allow the log walls to settle around the window casings. The logs are very green and are full of moisture. As they dry, there will be almost 2 ft of shrinkage in the overall height of the building. This will continue for years.
| Chatter News | Vertebrae Lodge | Solitude Lodge | Chatter Creek Cat Skiing | Great Links |
| Building Site | Chatter Road | Sawmill | Foundations | Log Construction | Trusses and Roof |
| Interior Construction | Outdoor Furnace | Summer Crew | | Mountain Lodge Construction
0 Comments:
Post a Comment
<< Home